Join the Blanchard Team..
Apply NowMicrogrid Control
Monitoring / control and asset optimization
Photovoltaic and energy storage systems
Monitoring / control, assets optimization
Transient Assist
Grid stabilization
767 kW | 1000 kW
Peak Shaving
Energy Time Shift
24 kW DC Output
30 - 3000 A
Open Transition (CG), Delayed Transition (CGD)
Contactor
Transient Assist
Heavy Duty mobile Grid Stabilization
1000 kW